The total installed capacity of the power plant is 52mw and there are 22 Nordex N117 – 2.4 MW brand and model wind turbines in the field. The power plants started on February 2016 and central its actives.

The Power Plant of Yahyalı has started its operation on February 2016 and it is actively generating electricity. Annual planned energy production of the power plant is 139 million Kwh. The Power Plant of Yahyalı have Gold Certificated; it is shows as environmental impact on power plant by preventing the release of approximately 76,000 tons of carbon annually. The Wind Power Plant provides the electricity needs of approximately 90,000 households annually.